Posts in your voice
Set the tone, audience and language — AI writes as if it were you. Each platform gets its own format and length.
Telematic finds topics in your sources, drafts posts, builds voiced videos and schedules them for your own Telegram, YouTube, VK and other channels. You review and approve before anything goes out.
New article · 2 min ago
7 places to catch the perfect sunset
You choose where topics come from
Step 1 of 4
Finds a topic
Watches your sources and spots fresh topics on its own
Already at workLive figures from the service: everything created and published with Telematic.
Setup takes about 5 minutes. No special skills needed.
Telegram, YouTube, VK or another platform: add the bot to your channel or sign in to your account. It takes a minute.
Websites, RSS, YouTube and Telegram channels. Or just describe a topic — AI will come up with the content itself.
Autopilot prepares drafts and a posting schedule. You approve each piece before it is published.
Telematic helps with writing, visuals, video editing and scheduling. You choose the topic and tone — and what gets published.
Set the tone, audience and language — AI writes as if it were you. Each platform gets its own format and length.
From photorealism to anime. Post illustrations, video frames and covers — no designer needed.
Publications go out on the right days and hours across every channel. The whole plan lives in one calendar.
Review every piece before it goes out; autopilot only prepares drafts and a schedule for your approval. One switch changes the mode.
Views, likes and comments across all channels — you see at once what your audience enjoys.
From an article to a video draft in minutes. You review it, then publish to your own channel.
A post, article, link or your idea
AI writes the script itself — or works carefully with your own text
Visuals up to 4K, voiceover and styled captions
The finished video is assembled in a few minutes
One-click publishing with cross-links
One service, different jobs. Pick yours.
No more hunting for topics and writing posts every morning. Telematic watches your sources, prepares drafts in your tone and schedules them once you approve.
An article, a link or an idea becomes a finished video with voiceover and captions. The long video and the Short from the same material go out together.
A separate project for each client: its own sources, tone, schedule and stats. Settings copy between projects in a couple of clicks.
Connect your website or RSS — every new article becomes a draft post and video for your channels, ready for your review.
Dashboard, content pipeline and AI video editor — a quick look at the product.



Real channels of our users. Take a look — this is what content made with Telematic looks like.
Top up your balance and spend it on posts, images and videos. No monthly fees, no pricing plans.
The first 1,320 tokens are on us
After that: 1,000 tokens = $10 (or €10 / 1,000 ₽). No card needed to start.
Compare the cost of running a channel by hand and with Telematic. Move the sliders to match your workload.
Double-sided rewards for you and your audience
Earn 50 tokens for every friend who verifies their account through your link.
Get 10% of every top-up your referrals make — for as long as they use the product.
Both sides win: invited users receive a bonus of 25 tokens on top of the welcome grant.
Find clear answers to the questions people ask most often.
Telematic is a service that runs your channels together with you. It collects topics from the sources you choose, writes posts from them, makes videos with a voiceover and publishes it all on a schedule.
Who it helps:
You can check every step by hand, or leave it to the schedule. Where to start is in Quick start.
You can start collection and publishing by hand, or turn on the schedules and automatic approval — then the whole path runs without you. In detail: Content sources, Publications and calendar, Autopilot.
On the home page click "Try it free". There are two ways:
As soon as you have logged in through Telegram or confirmed your e-mail, 50 tokens arrive on your balance. The next steps are in Quick start.
These are open to everyone right now:
For each platform the AI prepares its own version of the post, taking its limits on length and formatting into account. The other social networks are not open to everyone yet.
How to connect each platform is in Projects and platforms; for the website, see Website integration.
You choose the sources. These are supported:
Sources can be run by hand or on a schedule. The project filter cuts out what you do not need, and auto-analysis rates how important each item is. The details are in Content sources.
Yes. The service does not copy anyone else's posts. The source material is only a starting point: already during collection the AI writes its own text with its own headline and structure, following the audience, tone and language from your project settings. After you approve it, it prepares a separate version for each platform.
The original is kept alongside, so you can always compare it with the new text. Any text can be edited by hand, shortened or rewritten to your instructions — see Working with content.
Signing up takes a minute. Up to 1,320 tokens are free, and no card is needed.
Try it free